Skip to Content

How can we help? Call us at 1-866-815-7606.

Avanos 2 ft Touch Proof Electrode Long Lead Set

https://www.duraprohealth.com/web/image/product.template/349564/image_1920?unique=a9a0ad4

$ 174.60 174.6 USD $ 194.00

Not Available For Sale

This combination does not exist.

Product Information:

  • Products Model: EL-2MTP
  • Product Brand: Avanos Medical, Inc.
  • Condition: New
  • This special-order item ships in an estimated 4-6 weeks.
  • Warranty: Satisfaction Guaranteed

Lead Set, 2ft, Long Lead Sets, Two (2) Sizes

Always First.

Be the first to find out all the latest promotions, news, products, and trends.